Articles 97–144 of 439, newest first.
Tell us what you need and we reply with pricing, within 1 hour on working days.
50-piece minimum per design · Mixed sizes · We never share your details
Production is 10 to 15 working days from artwork approval and transit sits on top, which puts a fifty-set tracksuit order at three to four weeks door to door.
Four numbers decide whether a tracksuit quote is real: the minimum in sets, what the set price includes, when the lead time starts, and whether both halves share a dye lot.
Screen printing gets cheaper as a tracksuit run grows; embroidery barely moves, because the machine time is the same on every set you make.
Colour count is free on a DTF transfer and paid for per screen on a press, which is the line that decides most tracksuit decoration arguments.
Puff embroidery lifts a mark off the fleece with foam under the satin stitch, which changes the look, the stitch count and where on a set it can sensibly sit.
Cotton feels better in the hand and moves after a hot wash; a poly blend holds its shape and its colour but never quite has the same handle.
Fleece for tracksuit sets runs roughly 280 to 450 GSM, and that number decides drape, warmth, drying time and what a buyer thinks the set is worth.
Approve tracksuit artwork in October and a December delivery is comfortable; leave it until late November and the build window alone swallows the month.
Black Friday stock has to be in the building before the promotion opens, which puts a tracksuit order in the first half of October rather than November.
Freshers kit that arrives in week one has to be ordered in July, because nobody is around in August to approve artwork or chase a size list.
A January launch needs a November order, because December loses working days to holidays and carriers run long before they run normally again.
Summer event kit is ordered in March, and the awkward question underneath it is which weight anybody will actually wear in June.
Leavers kit fails on admin rather than production, and the fix is collecting names and sizes long before the artwork goes near approval.
Tour merch has to be in the van before the first date rather than in a warehouse behind it, which moves the order about six weeks earlier than most plan.
Stand kit arriving the night before a show is a risk with no upside, so the order goes in five to six weeks ahead of the first hall.
GSM is grams per square metre, and on a tracksuit set it quietly decides warmth, drape, drying time and what a buyer thinks the set is worth.
Tops and joggers are sized independently on a co-ord, which solves most of the fit problem before it starts, provided the size form asks for both.
The halves of a co-ord match because they come from one dye lot, not because two separate garments were ordered in the same colour name.
A co-ord gives you two garments to brand, and the usual mistake is putting the same logo at the same size on both of them.
A co-ord set only stays a set while both halves have had the same life. Here is the wash routine that keeps a printed tracksuit looking like one order.
Labelling is fitted during production, never afterwards, so the choice between woven, tagless and tear-out belongs in the brief rather than the follow-up email.
A tracksuit order arrives as sets in bags, bags in cartons and cartons on a pallet. Knowing that structure in advance makes the unpack an hour rather than a day.
Ten minutes with one set out of the box tells you most of what you need to know about the other 249. Here is what to look at and in what order.
Six stages stand between an enquiry and a pallet of tracksuits. Knowing what happens at each one is what stops a first order drifting by a fortnight.
Most quote revisions come from information missing in the first email. Six details, sent once, turn an estimate into a number you can budget against.
A wholesale quote is a set of assumptions with a number attached. Reading it properly means knowing which costs are inside the per-set figure and which are not.
Build the number from the bottom up and a tracksuit order holds no surprises. Four lines and a contingency cover the whole project.
Retail pricing starts with landed cost, not the quoted set price. Here is what belongs in that figure before any margin is applied.
The order arriving is the easy part. Getting 50 sets onto the right 50 people is where most of the work actually sits.
Club tracksuits start from £50 a set at the 50-set minimum. What moves that figure is quantity and decoration, not how complicated the crest looks.
Production is 10 to 15 working days from approval. Everything that makes club kit late happens before that clock starts.
A squad is not a bell curve. Splitting sizes off real measurements rather than assumptions is what stops six sets sitting in a kit bag all season.
A crest wants thread, a sponsor with gradients wants ink, and numbers want whatever survives a season of training. The garment decides more than the budget does.
A sample is a physical garment in your fabric with your crest on it. For a committee spending club funds, that is a different kind of evidence to a render.
Dye lots drift between runs. That single fact drives almost every decision a club makes about restocking kit mid-season.
Fifty sets is the floor, and for a society that number is usually the whole question. Here is how the per-member figure actually works out.
Freshers week is a fixed date and the academic calendar is unforgiving. Ordering society kit is a scheduling problem before it is a buying one.
Every society sizing problem is really a data collection problem. Fix the form and the order fixes itself.
Societies want a small crest at the front and something loud on the back. Those two things want different decoration methods, and both can be on one garment.
A society tracksuit sample costs £150 and comes back off the bulk invoice. Here is what it proves, and what the committee should look at.
A society tracksuit restock matches the first run when it is ordered against a recorded spec. Here is what to record and when to reorder.
Branded gym kit starts from £12 a cap and £30 a hoodie at fifty pieces. Here is how the numbers move as the order grows.
Fifty pieces per design, sizes mixed freely. The part that catches gyms out is what counts as a separate design.
Ten to fifteen working days of production is the easy part. Here is the rest of the timeline a gym has to plan around.
Sizes cost nothing to spread inside the fifty. Getting the curve wrong, though, is what leaves boxes unopened a year later.
The second order is where a gym finds out whether its first one was planned or guessed. Here is how to make the restock routine.
One garment, made to your specification, before fifty are. Here is what a gym should be testing during that fortnight.
Beyond the print on the chest, a gym can brand the neck, the tag and the bag. Here is what each option does and when it is worth specifying.