Delivery worldwide from Pakistan+44 7367 067226info@velocity-wear.com

Delivery worldwide from Pakistan

First orders

No samples. Start with 20 pieces

We do not make samples. Instead, your first order can be a production run of 20 pieces per design, sizes mixed, on any clothing range, priced in your quote. After that the minimum is 50 pieces per design.

No obligation

Get in touch

Tell us what you need and we reply with pricing.

We no longer offer samples. Instead, a first clothing order can be a small production run from 20 pieces per design, priced in your quote. How it works

Leave it unticked and we may email you now and then about offers on products like the ones you ask about. Every email has an unsubscribe link. Privacy policy

50-piece minimum per design ยท Mixed sizes ยท We never share your details

Do you make samples?

No. Instead of a single sample, a new customerโ€™s first order can be a production run of 20 pieces per design. You get real garments in your fabric, colour and decoration, made the way a full order is made, so you can check fit, fabric and finish on the real thing before a full order. Before anything is made, you approve a digital proof.

How the 20-piece first run works

Who
A new customer, on their first order with us.
What
20 pieces per design, sizes mixed, on any clothing range: hoodies, t-shirts, polo shirts, tracksuits, jackets, uniforms, teamwear and the rest.
Price
Quoted per order, on the garment, fabric, decoration and sizes you choose, like any other order.
After that
Your next orders follow the standard minimum of 50 pieces per design.

Not for leather jackets, towels, bottles, keychains, wristbands or polythene bags: they keep their own minimums (leather jackets from 10 per design for a limited time, normally 20), and none of them takes samples.

From brief to delivery

  1. 01

    Send your brief

    The garment, 20 pieces per design, your size split, colours and artwork. A rough sketch is fine.

  2. 02

    Get your quote

    An itemised quote comes back to you.

  3. 03

    Approve the digital proof

    You see a digital proof of every design. Nothing is made until you approve it.

  4. 04

    Production and delivery

    Production takes 10 to 15 working days from artwork approval and the 50% deposit. Delivery is charged on the weight and dimensions of the shipment and quoted with your order, separately from the product price. Shipping time is additional.

We no longer offer samples. Instead, a first clothing order can be a small production run from 20 pieces per design, priced in your quote.

Leave it unticked and we may email you now and then about offers on products like the ones you ask about. Every email has an unsubscribe link. Privacy policy

For a new customerโ€™s first order on clothing. Leather jackets, towels, bottles, keychains, wristbands and bags keep their own minimums.

Why a first run?

We donโ€™t make samples. Your first order can be a production run of 20 pieces per design instead: real garments in your fabric, colour and decoration, so you check fit, fabric and finish on the real thing before a full order.

  • 20 pieces per design, sizes mixed
  • Real garments, made the way a full order is made
  • Check fit, fabric and decoration on the real thing
  • You approve a digital proof before anything is made
  • Priced in your quote, like any other order
  • After that, 50 pieces per design
FAQ

First orders, answered

We do not make samples. Instead, your first order can be a production run of 20 pieces per design, sizes mixed, on any clothing range, priced in your quote. After that the minimum is 50 pieces per design. Before anything is made you approve a digital proof of the design.

It is quoted per order, on the garment, fabric, decoration and sizes you choose, like any other order. Send your brief and an itemised quote comes back to you.

A new customer, on their first order: 20 pieces per design, sizes mixed, on any clothing range. After that first order the minimum is 50 pieces per design.

Leather jackets (from 10 per design for a limited time, normally 20), towels, bottles, keychains, wristbands and polythene bags keep their own minimums. None of them takes samples either.

Production takes 10 to 15 working days from artwork approval, the same as any order, plus shipping. Shipping time depends on the destination and is confirmed with your quote.

Yes. You approve a digital proof of every design before production starts, and nothing is made until you do.