Towels 19 September 2026 4 min read

Ordering Towels for Freshers

By The Velocity Wear Team

Get in touch

No obligation

Tell us what you need and we reply with pricing, usually within hours on working days.

50-piece minimum · Mixed sizes · We never share your details

Freshers towels need ordering in July for a September arrival. Production takes 10 to 15 working days from artwork approval and transit follows, but the real constraint is August: universities, unions and suppliers all run thin, approvals take longer and a week disappears without anyone noticing. Starting in July gives that month somewhere to go.

Why does a freshers towel order start in July?

Because the date does not move. Freshers week happens when term starts, and stock that arrives in week two has missed the entire purpose. Counting back from a mid-September in-hand date, you want production running in August, which means artwork approved by late July, which means the design agreed and the quote signed earlier than that. Union committees hand over in the summer as well, so the person who approves the artwork in July may not be the person who commissioned it in June.

Branded towels prepared as part of a student welcome pack
Welcome-pack stock has to land before the first week, not during it.

Who is the towel for — student, society or staff?

These are three different products. A towel in a welcome pack is a giveaway: light, cheap to ship in volume, branded simply. A society towel is merchandise that students choose to buy, so it can be heavier and carry a design they actually want. A staff towel for a sports centre or gym is working stock that goes through a commercial laundry every day and needs to be specified for that life instead. Trying to serve all three with one order is how you end up with towels nobody uses. Each is its own design and therefore its own 50-piece minimum.

How many designs can a budget carry?

Fewer than most committees want. Every design needs 50 pieces, and every colourway that needs its own screens counts separately, so a plan with six society variants is six minimums before anyone has discussed quantity. The better approach is one strong base design across a larger run, taking the volume step up through the tiers — up to 35% off the 50-piece rate at the highest — and differentiating with packaging rather than with separate print runs. Options for that are in labels and packaging for bulk towels.

What goes wrong in August?

Approval. The proof goes out, the committee is scattered, and the file sits unopened for ten days that were not in anyone's plan. Nominate one person with authority to sign off before the proof exists and hold them to it. Everything else — production, freight, packing — is predictable. Start the spec through the towels range, pick the supplier properly using choosing a wholesale towel supplier, and if the design is new, the £150 credited sample is worth taking in June so July is spent ordering rather than deciding.

Delivery address is the other August problem. Campus post rooms run reduced hours over the summer and a pallet arriving at a building nobody is staffing does not get signed for. Confirm where the consignment is going, who will be there, and whether the receiving point can physically take a pallet rather than a stack of parcels. Get that agreed at the same time as the quantity.

Finally, think about what the towel is meant to achieve. A giveaway that ends up in a drawer has cost money and done nothing; one that gets taken to the sports centre twice a week works for you all year. That difference comes down to whether the design is something a student would choose to be seen with, which is a question worth asking a few of them before the artwork is signed off rather than after.

Handing over is the last thing to plan for. Whoever runs this in July will have moved on by the time the reorder question comes round, so write down the job number, the quantity, the supplier contact and what you would change next time, and leave it somewhere the next committee will find it. That single document saves the following year's team from starting the whole process from a blank page in June.

Order what you just read about

Every range is made to order from a 50-piece minimum in 10–15 working days, with tiered pricing up to 35% off at volume. Price your order or order samples first.

FAQ

Quick Answers

Common questions about towels — answered.

Only if they share the design. The 50-piece minimum counts designs, so two different logos are two orders even if they ship to the same address on the same day.

A lighter cloth, which keeps unit and freight costs down across a large run. Save the heavier weights for merchandise students are paying for.

For that year, effectively yes. The production window plus transit would put delivery after the week has happened, which is why the decision belongs in July.

Yes, and the artwork stays on file so setup does not start again. The repeat is its own 50-piece minimum and runs to the same 10 to 15 working day build.

Want to order your custom clothes now?

Tell us what you want made and we’ll reply within hours with pricing. Minimum 50 pieces per design, made in 10 to 15 working days from artwork approval, shipped worldwide.

Free and no obligation. Want to see the quality first? A sample is £150 for one or two pieces including worldwide shipping, credited against your bulk invoice.

Keep reading