Wholesale 19 September 2026 4 min read

Wholesale Polythene Bags: lead time

By The Velocity Wear Team

Get in touch

No obligation

Tell us what you need and we reply with pricing, usually within hours on working days.

50-piece minimum · Mixed sizes · We never share your details

Printed polythene bags take 10 to 15 working days to produce from the moment artwork is approved, with delivery transit on top. That is two to three calendar weeks of production once weekends are removed. The date that matters to you is the approval date, not the day you send the enquiry, because nothing in the schedule starts moving until the file is signed off.

How long does a bag order take?

Budget 15 working days for production and treat 10 as the happy case. On top of that, add transit to wherever the bags are going; we deliver to the UK, USA and Europe, and the distance changes the tail rather than the build. A realistic total for a UK delivery is three to four weeks from approval, and planning to that number rather than the optimistic one is what keeps packaging off your critical path.

The build itself is not the variable part. Extrusion and print run to a schedule; what varies is how long the artwork spends going back and forth beforehand. Check the specification on the polythene bags page and browse the rest of the wholesale range at the same time, because ordering bags and garments together means one approval cycle rather than two.

What starts the clock?

Artwork approval, specifically your sign-off on the proof we send back. Before that point the job is a conversation. After it, the job is a slot. This distinction catches out buyers who count from the day they paid, then find the delivery date has moved because the proof sat unopened for a week in somebody's inbox.

The same principle applies across every product, and the reasons behind it are set out in understanding lead times: what delays a clothing order. The short version is that approval is the last point at which a change is cheap, so the schedule is measured from there deliberately.

Custom printed polythene bags stacked for dispatch
Production runs to a schedule; approval is what sets its start date.

When should the order go in?

Work backwards from the day you need to start packing. Subtract transit, subtract 15 working days, then subtract whatever your own approval process takes — a day if you decide alone, a fortnight if a committee is involved. If you also want a £150 sample first, and for a first bag order that is a sensible spend since it is credited against the bulk invoice, add a further round trip before the production clock starts at all.

For a seasonal peak, place the order a clear month before the volume arrives rather than when the current box runs low. Running out of packaging stops dispatch entirely, which is a more expensive failure than running out of any single garment size.

Can bags run alongside a garment order?

They can, and it is the efficient way to buy. Both sit in the same 10 to 15 working day window, so a combined order approved on the same day arrives together rather than staggered. If you are planning a launch around this, the approach in building a launch calendar that does not slip works for packaging and product alike.

The one thing to watch is that a combined order is only as fast as its slowest approval. If the garment artwork is settled and the bag artwork is not, approve them separately rather than holding both. Two deliveries a week apart beat one delivery two weeks late.

Watch the reorder point rather than the stock level. Work out how many bags a typical week consumes, multiply that by the four weeks a replacement run takes to arrive, and treat the result as the level at which the next order goes in. Warehouses that reorder when the shelf looks empty are permanently a fortnight short, and packaging is the one shortage that halts everything else. Writing the trigger number on the shelf itself works better than any calendar reminder.

Ready to order?

Every range is made to order from a 50-piece minimum in 10–15 working days, with tiered pricing up to 35% off at volume. Price your order or order samples first.

FAQ

Quick Answers

Common questions about wholesale — answered.

Not materially inside the normal range. The 10 to 15 working day window covers ordinary bulk quantities, so 500 bags and 2,000 bags land on a similar schedule.

A sample adds its own production and transit before you approve for bulk, so treat it as an extra round trip. It is worth booking at the start rather than as a late reassurance.

No. Ten to 15 working days is two to three calendar weeks once weekends are excluded, and public holidays extend it further. Always convert to real dates when planning.

The honest answer is that production time is production time. The place to recover days is your own approval stage, which is usually where the slippage came from.

Want to order your custom clothes now?

Tell us what you want made and we’ll reply within hours with pricing. Minimum 50 pieces per design, made in 10 to 15 working days from artwork approval, shipped worldwide.

Free and no obligation. Want to see the quality first? A sample is £150 for one or two pieces including worldwide shipping, credited against your bulk invoice.

Keep reading