Denim 19 September 2026 4 min read

Reordering Wholesale Denim Jackets in Colour

By The Velocity Wear Team

Get in touch

No obligation

Tell us what you need and we reply with pricing, usually within hours on working days.

50-piece minimum · Mixed sizes · We never share your details

A denim reorder runs to the same fifty-piece minimum as the first order, and it will not be a perfect colour match. Indigo is dyed and finished in lots, and two lots produced months apart differ slightly. The artwork and setup carry over, which keeps the process quick, but the shade is the one variable nobody can guarantee across runs.

Why do two denim runs never match exactly?

Indigo is unusually sensitive to process. The depth of shade depends on the dye bath, the number of dips, the yarn batch and the finishing wash, and each of those has a tolerance rather than a fixed value. A finishing wash adds a second layer of variation, because abrasion and enzyme treatments are not identical between loads. The result is that two jackets from the same specification, made four months apart, can sit noticeably differently beside each other while both being correct against the spec. The same underlying issue affects every dyed fabric and is explained in colour matching.

Two custom denim jackets from separate production runs shown side by side
Two runs of the same specification, dyed in different lots.

What should you keep from the first order?

Three things, all of them small and all of them easy to lose. Keep one finished jacket from the original run, untouched, as a physical reference: a photograph is useless for judging shade. Keep the approved artwork file and the specification sheet, including the placement measurements and the thread or ink references. And keep the size breakdown you actually issued, not the one you ordered, because the difference between them tells you how to weight the restock. With those three, a repeat run is a short conversation rather than a rebuild. The current specification and from-price sit on the wholesale denim jackets page.

Does a repeat order start the minimum again?

Yes. Fifty pieces per design applies to every production run, first or fifth, because the run itself has to be scheduled, cut and decorated regardless of history. What does carry over is the preparation: the artwork is already production-ready, the stitch file exists, and the specification is settled. That usually means less back and forth before approval, though the ten to fifteen working day production window still applies once approval happens. How reorders work across the rest of the catalogue is covered in reordering the same design later.

How do you plan a restock rhythm?

Order fewer times in larger quantities. Every separate run is a new fifty, a new schedule and a new dye lot, so four runs of fifty in a year give you four slightly different jackets and none of the quantity benefit. One run of two hundred sits in a higher tier, where the saving climbs towards 35% off the fifty-piece price, and produces a single consistent batch. Set a reorder trigger based on the size that empties first rather than on total stock, and place the order while you still have six weeks of cover. Six weeks is not arbitrary: it covers artwork confirmation, ten to fifteen working days of production and transit, with a few days spare for the courier that misses a slot. Anything tighter and you are ordering from an empty shelf. The band structure is on the pricing page if you want to check where your quantity lands.

Tell your wearers what to expect if the two runs will be seen side by side. A staff team issued jackets from a second batch notices a shade difference immediately, and one sentence of explanation at the point of issue prevents the assumption that the newer batch is a lesser one. For a retail line, presenting the batches as separate deliveries avoids the comparison altogether. Shade variation is a property of indigo rather than a defect, and saying so up front is easier than explaining it later.

Order what you just read about

Every range is made to order from a 50-piece minimum in 10–15 working days, with tiered pricing up to 35% off at volume. Price your order or order samples first.

FAQ

Quick Answers

Common questions about denim — answered.

A close match is achievable when a physical reference from the original run is supplied, but an exact match across dye lots cannot be promised. Sending a jacket rather than a photograph gives the best result.

The preparation stage is usually shorter because the artwork and setup already exist. Production itself still runs ten to fifteen working days from approval.

Yes, and most buyers should. The first order teaches you which sizes moved, so the second breakdown ought to look different from the first rather than repeating it.

Holding stock from a larger single run keeps the colour consistent and lands in a better quantity band. Frequent small runs cost more per piece and introduce shade variation between them.

Want to order your custom clothes now?

Tell us what you want made and we’ll reply within hours with pricing. Minimum 50 pieces per design, made in 10 to 15 working days from artwork approval, shipped worldwide.

Free and no obligation. Want to see the quality first? A sample is £150 for one or two pieces including worldwide shipping, credited against your bulk invoice.

Keep reading