Hospitality uniforms take 10 to 15 working days to produce once artwork is approved, with delivery transit on top. Counting backwards from an opening night, that means committing roughly six weeks ahead if you want a sample seen and signed off first. The clock starts at artwork approval rather than at the enquiry, which is the detail that catches venues out.

Hospitality has a habit of deciding on uniforms last, after the fit-out, the menu and the licence. By that point the opening date is already public, which turns a routine order into a problem with no good solutions left. If a venue is being built, put the uniform order on the same programme as the furniture rather than on a list of things to do at the end. Starting early costs nothing and it removes the one part of the process that cannot be accelerated once a date has been announced.

How long from approval to delivery?

Two to three working weeks of production, then transit to your destination in the UK, USA or Europe. Nothing in the production window depends on how many pieces you order within normal volumes, so a hundred-piece venue order and a five-hundred-piece group order sit in the same range. What does move the date is how long approval takes on your side.

Build the approval step into your own calendar as a task with a name against it. Artwork sitting in an inbox while a general manager works doubles is the most common source of delay, and it is entirely inside your control. Details of the range and what can run together are on the wholesale uniforms page.

Branded hospitality polo shirt photographed against a plain background
The production clock starts the day artwork is signed off.

When should a restaurant place the order?

Work backwards in four blocks: sample, approval, production, transit. If you want a physical sample in hand before committing, the £150 sample runs first and is credited against the bulk order afterwards, which adds its own window before the main run even begins. A venue opening in eight weeks is comfortable. A venue opening in three is choosing between skipping the sample and pushing the date.

Seasonal venues should order against the season rather than the calendar. Beer gardens and seaside sites want stock in hand before the first warm weekend, not during it, and that usually means placing in late winter. Our general piece on apparel production lead times covers why the window sits where it does.

What slows a hospitality order down?

Late artwork, unclear colour references and mid-run changes. Switching a shirt colour after approval restarts the process, and adding a second design after the fact brings a fresh fifty-piece floor with it rather than joining the existing run. Fixing the spec before approval is quicker than fixing it afterwards, every time.

Can you stagger delivery across sites?

It is usually better to produce once and distribute yourself. One consolidated run keeps every site on the same dye lot and the same band, then internal transfers move stock where it is needed. The restaurants and hospitality overview sets out how multi-site programmes are normally structured, and the size question across venues is covered in splitting a restaurant order across sizes.

Where sites genuinely open on different dates, order once and warehouse the later allocations rather than splitting the production across separate runs. Each additional run resets to the entry band and carries its own freight, so staggering the manufacture to match the opening schedule is the expensive way to solve a storage problem. A pallet in a back room for six weeks costs nothing; a second production run costs a band.

Order what you just read about

Every range is made to order from a 50-piece minimum in 10–15 working days, with tiered pricing up to 35% off at volume. Price your order or order samples first.

FAQ

Quick Answers

Common questions about workwear — answered.

The 10 to 15 working day window is the realistic production time and is quoted as such. The way to protect an opening date is to start earlier rather than to compress the run.

Not usually the production window itself, since colourways run alongside each other. It does mean a second fifty-piece minimum, so the decision affects cost more than schedule.

It depends on destination and freight method across the UK, USA and Europe, and it is confirmed with the quote. Treat it as a separate block after production rather than part of it.

Order to the rota you expect plus a reserve in the common sizes. Adding a handful of pieces later means a fresh run at the entry band, which is why spares are cheaper bought upfront.

Want to order your custom clothes now?

Tell us what you want made and we’ll reply within hours with pricing. Minimum 50 pieces per design, made in 10 to 15 working days from artwork approval, shipped worldwide.

Free and no obligation. Want to see the quality first? A sample is £150 for one or two pieces including worldwide shipping, credited against your bulk invoice.

Keep reading