Caps 19 September 2026 3 min read

Caps for Agencies: lead time

By The Velocity Wear Team

Get in touch

No obligation

Tell us what you need and we reply with pricing, usually within hours on working days.

50-piece minimum · Mixed sizes · We never share your details

Cap production takes 10 to 15 working days from the moment artwork is approved, with delivery transit on top. The clock does not start when the client says yes to the idea — it starts when someone signs off the final stitch file. For an agency, that gap between verbal approval and actual sign-off is where most missed launch dates are created.

When does the fifteen-day clock actually start?

At artwork approval, not at purchase order. Between the two sits digitising, a proof, and whatever internal review the client's brand team insists on. A single round of comments from a brand guardian can add a week that nobody budgeted, and it is invisible on the production schedule because production has not begun. Styles and specifications are on the wholesale caps page, and the way we work with client-side teams is set out on the corporate pages.

The practical fix is to name an approver. One person, one round, a deadline in the campaign plan. Agencies that route sign-off through a committee should add that committee's calendar to the timeline in writing.

Embroidered trucker cap with a mesh back panel
Fifteen working days is the run, not the whole project.

How far ahead should a campaign order be placed?

Work backwards from the date the caps need to be in the room, not the date of the event. Allow for delivery transit, then 15 working days of production as the outer figure, then the approval round, then artwork preparation. On a UK campaign that is comfortably six to seven weeks from brief to boxes. Across the USA or Europe, add the freight leg.

  • Week one: blank chosen, sample ordered, artwork prepared to the stitch file.
  • Week two: sample reviewed and approved, or amended once and re-approved.
  • Weeks three to five: production, 10 to 15 working days from that approval.
  • Week six: transit, unpacking and distribution to whoever is handing them out.

What can be compressed, and what cannot?

Approval can be compressed, and usually should be. Production cannot — the 10 to 15 working days covers real machine time and real quality checks, and squeezing it is how you get a box of caps with a crooked logo the day before a launch. If the date is genuinely immovable and the calendar is short, the honest answer is to reduce the scope: one design instead of two, or a simpler mark that digitises cleanly first time.

The sample is the step agencies are most tempted to drop. It is the wrong one to cut on a client campaign, because the sample is the only object anyone can actually hold before fifty pieces exist — caps for agencies: samples makes that case in detail.

What happens if the client changes the brief mid-run?

Before approval, a change costs a round of artwork. After approval, it restarts the 10 to 15 working days, because the run is either scheduled or under way. Colour changes to the blank are the most expensive kind, since a different panel colour is a different design and a different fifty-piece minimum.

Build one change window into the plan and close it formally. Where a campaign runs long enough to need a second batch, plan the repeat at the same time — caps for agencies: reordering covers how repeats are scheduled, and apparel production lead times explained sets out what happens inside those working days.

Order what you just read about

Every range is made to order from a 50-piece minimum in 10–15 working days, with tiered pricing up to 35% off at volume. Price your order or order samples first.

FAQ

Quick Answers

Common questions about caps — answered.

Working days, so a fortnight of production is closer to three calendar weeks once weekends are counted. Public holidays in the production or destination country stretch it further, which matters most around December and the New Year.

No. The 10 to 15 working days covers production only, and transit to the UK, the USA or Europe is added on top. Agencies working to a launch date should quote both figures separately so nobody conflates them.

There is no shortcut that keeps the quality intact, so the honest lever is scope rather than speed. Cutting to one design, one decoration position and a straightforward stitch file is the fastest realistic route through the same fifteen days.

The finish date moves by the same number of days. That is why the approval deadline belongs in the campaign plan as a dated milestone, with a named approver, rather than as an assumption that someone will look at the proof promptly.

Want to order your custom clothes now?

Tell us what you want made and we’ll reply within hours with pricing. Minimum 50 pieces per design, made in 10 to 15 working days from artwork approval, shipped worldwide.

Free and no obligation. Want to see the quality first? A sample is £150 for one or two pieces including worldwide shipping, credited against your bulk invoice.

Keep reading