Workwear 19 September 2026 4 min read

How Long Do Bulk Jackets & Outerwear Take to Make?

By The Velocity Wear Team

Get in touch

No obligation

Tell us what you need and we reply with pricing, usually within hours on working days.

50-piece minimum · Mixed sizes · We never share your details

Bulk jackets take 10 to 15 working days to make, counted from the moment you approve the artwork rather than from the day you first enquire. Delivery transit sits on top of that. For a 50-piece run of softshells or coach jackets, a sensible door-to-door plan is three to five weeks, and most of the variation comes from how quickly the artwork gets signed off.

Where do the 10 to 15 working days actually go?

Outerwear is a built garment, not a printed blank. The shell is cut, the panels are joined, zips and pockets go in, and only then does decoration happen. On an embroidered run the digitising and a stitch-out on the real fabric come before the production heads start. Screens, if you are printing, are burned once per colour per design. None of those steps take long on their own, but they are sequential, which is why the window is a range rather than a single number. Our wholesale jackets page sets out what is built to order and what is quoted per job.

Custom branded jackets and outerwear from a bulk production run
Softshell, puffer, coach and varsity styles all run on the same 10 to 15 working day build.

When does the clock start on a jacket order?

At artwork approval. That is the single most useful thing to know about the schedule, because it puts the front half in your hands. A buyer who sends a clean vector file and replies to the proof the same day is weeks ahead of one who is still waiting on a committee. If your logo needs redrawing, or the colours need to be agreed with someone who is on leave, that time is added before the 10 to 15 days begin, not inside them. The general shape of an apparel schedule is covered in apparel production lead times explained.

Does a puffer take longer than a coach jacket?

Not in a way that breaks the window. A padded puffer has more construction in it than a single-layer coach jacket, and a varsity with contrast sleeves and ribbed trims has more parts again, but all of them sit inside the same 10 to 15 working day build. What moves the date is the decoration rather than the shell: a large multi-colour print across the back needs more press time than a left-chest logo, and heavy embroidery on a quilted panel runs slower than the same logo on a flat softshell.

How far ahead should you place the order?

Work backwards from the date the jackets need to be in hand and pad it twice. Take your delivery date, subtract transit to the UK, USA or Europe, subtract the 15 working day end of the build, then subtract a week for artwork and proofing. That lands most buyers six to eight weeks out. If the jackets exist for a specific event, order earlier than the maths suggests, because the one thing that cannot be recovered is a date that has passed. Changes made after sign-off are a separate problem, and can I change my order after approving artwork explains what is still possible once the clock has started.

What can you do to shorten it?

  • Send print-ready artwork with the enquiry rather than after the quote.
  • Name one person who can approve the proof without a meeting.
  • Settle colours before the proof stage, not during it.
  • Order a single design in one colourway first; each extra design is its own run of 50.

Quantity itself does not stretch the build much. A 250-piece run does not take five times as long as a 50-piece one, and it lands in a better price tier, so if the demand is genuinely there the larger order is usually the better use of the same schedule. The tiers are listed on the pricing page, running from 50 to 99 pieces up to 1,000 and over, with up to 35% off the 50-piece price at the top end.

Order what you just read about

Every range is made to order from a 50-piece minimum in 10–15 working days, with tiered pricing up to 35% off at volume. Price your order or order samples first.

FAQ

Quick Answers

Common questions about workwear — answered.

No. It is the production build only, measured from artwork approval. Quoting, artwork preparation, proofing and delivery transit all sit outside it, which is why most buyers plan six to eight weeks end to end.

The minimum is 50 pieces per design and it does not change the build window. A 50-piece order and a 500-piece order both run inside the same 10 to 15 working days in normal conditions.

Yes. A sample is £150 and that fee is credited against a bulk order placed afterwards. Build the sample round trip into your schedule, because production only starts once the bulk artwork is approved.

The build restarts from the new approval date. Screens may need reburning and an embroidery file may need redigitising, so treat the approval as the point of no return and check the proof properly before replying.

Want to order your custom clothes now?

Tell us what you want made and we’ll reply within hours with pricing. Minimum 50 pieces per design, made in 10 to 15 working days from artwork approval, shipped worldwide.

Free and no obligation. Want to see the quality first? A sample is £150 for one or two pieces including worldwide shipping, credited against your bulk invoice.

Keep reading