Production takes 10 to 15 working days from artwork approval, with delivery transit on top. The clock does not start when you place the order; it starts when the artwork is signed off. For an office with a conference, an office move or an onboarding intake in the diary, count backwards from the date the kit is needed and allow for the days your own approvals will take.

What actually starts the clock?

Artwork approval. Everything before that point is preparation and sits outside the 10 to 15 working days: agreeing the garment from the wholesale polo shirts range, confirming the colour, collecting sizes, laying out the logo at the right scale, and getting whoever owns the brand to say yes. In a company of any size, that last step is the one that eats a week. A single named approver, briefed before the quote goes out, is worth more to your delivery date than any amount of chasing afterwards.

If you want a sample first, add its own stage in front of all of that. The £150 sample is credited against the bulk order and is the right call for a first run, but it is a sequential step, not a parallel one. Polo shirts for offices: samples explains what it covers and when it is worth skipping.

Corporate polo shirts packed and ready for despatch to an office
Production is measured from approval, not from the day you enquire.

When should you place an order for a fixed date?

Work back in four blocks: transit to your address, 15 working days of production as the safe end of the window, a few days for artwork rounds, and your own internal sign-off. For an event in six weeks that is comfortable. For one in three it is tight but workable if the artwork is already settled and sizes have been collected. For one in ten days it is not, and the honest answer is to change the plan rather than the deadline. You can start the conversation from the corporate page.

Seasonal load matters too. Autumn is heavy for corporate orders because conference season and new intakes collide, so a September delivery decided in late August has less slack in it than the same order placed in June. Nothing about the stated window changes; your margin for a second artwork round does.

What causes the delays that do happen?

Almost always artwork and sizes. A logo supplied as a small screenshot has to be redrawn before it can be stitched or separated for screens, and that redraw needs approving, which is another round trip. Sizes gathered by email from sixty people take as long as the office is slow to reply. Both are solvable a fortnight before the order rather than during it.

  • Logo supplied at a size too small to reproduce, needing a redraw
  • Brand approval waiting on somebody who was never told it was coming
  • A size list still missing a dozen people when the order is placed
  • A garment colour changed after approval, which restarts the sign-off
  • A delivery address that turns out to be a site with no goods entrance

Can anything be brought forward?

The preparation can, and that is where the real time lives. Collect sizes while the quote is being prepared, as polo shirts for offices: size splits describes, and have the logo ready as vector artwork before the first conversation. Firms that run apparel as an ongoing programme rather than a yearly scramble, along the lines of building a corporate apparel program, get their kit faster because nothing has to be decided twice. The production window itself is fixed; the queue in front of it is not.

If your date is genuinely immovable and close, say so in the first conversation rather than at the end of it. Knowing the deadline changes the advice we give about garments and decoration, because some combinations reach approval faster than others.

Order what you just read about

Every range is made to order from a 50-piece minimum in 10–15 working days, with tiered pricing up to 35% off at volume. Price your order or order samples first.

FAQ

Quick Answers

Common questions about polos — answered.

No, they are working days, so a fortnight of production spans closer to three calendar weeks. Public holidays in the production or delivery country stretch that further and are worth checking.

Transit sits on top of production and depends on the delivery address. We ship to the UK, the USA and Europe, and the transit estimate is given with the quote for your specific destination.

A split delivery can usually be arranged at the point of order, but the production window applies to the whole run, so it moves pieces between addresses rather than making any of them faster.

The clock restarts from the new approval. Small position tweaks are usually absorbed, but a changed logo, garment colour or placement means the setup is redone and the timeline runs again from there.

Want to order your custom clothes now?

Tell us what you want made and we’ll reply within hours with pricing. Minimum 50 pieces per design, made in 10 to 15 working days from artwork approval, shipped worldwide.

Free and no obligation. Want to see the quality first? A sample is £150 for one or two pieces including worldwide shipping, credited against your bulk invoice.

Keep reading