For a May or June event, order in March or early April. Production takes 10 to 15 working days from artwork approval, transit follows, and a week of buffer before load-in is what stops a late carton becoming a crisis. Add a fortnight if you want a sample, which puts a first-time summer order in late February.
When should summer kit be ordered?
Six weeks before you need it in hand, eight with a sample. For a late May date that means an early April order at the latest, and mid-March is more comfortable. The events and festivals page covers the summer range, and the wholesale page sets out minimums and tiers.
Summer kit is also the lightest kit of the year, which tempts organisers into leaving it late because a printed tee feels simple. The garment is simple; the schedule around it is the same as everything else.

How does a May date count back?
Take the day the gates open, then work backwards through each stage. Doing it in this order, rather than forwards from today, is what keeps the buffer where it belongs.
- 1Gates open: the immovable date.
- 2Minus one week: kit in hand before load-in, with time to count and check.
- 3Minus three to five days: transit to your address.
- 4Minus 10 to 15 working days: the build from artwork approval.
- 5Minus one week: artwork rounds, size collection and sign-off.
- 6Minus two more weeks if a sample is part of the plan.
The same count-back applied to a general event date appears in our guide to lead times events should plan for.
What should a summer order include beyond tees?
More than organisers expect. Summer days are long and summer nights are cold, so a crew working from load-in to breakdown needs a layer as well as a shirt. That is a second design and therefore a second 50 pieces, which is a budget fact rather than a preference.
- Caps from $12 a piece, which solve sun exposure and identification at once.
- A hoodie from $31 for overnight and early morning crew shifts.
- Polos from $18 where staff are customer-facing and a tee reads too casual.
- Towels, bottles and keychains, all quoted per job, where the event has a merch stall or a goody bag.
Why is spring the busiest window?
Because every summer event in the calendar is ordering in the same eight weeks. That does not change our production window, but it does mean less room to absorb a change of mind on your side, and courier networks are busier than in the quiet months.
The practical response is to settle the design early and order once for the whole summer rather than per event. An organiser running three dates between May and August is better served by a single run covering all three, which reaches a higher discount tier, up to 35% at the top, and guarantees the crew match across every date. Our guide to custom apparel for events and venue staff covers how to plan that kit across a season rather than a weekend.
Keep dates and years off the artwork if you take that route. A plain event mark carries through August and into next spring; a design printed with this year on it is unusable the moment the last gate closes. The same logic applies to anything naming a single stage, headliner or sponsor, none of which survive contact with next year's line-up.
Summer weather is the variable nobody can schedule around, so buy for both versions of the weekend. A crew equipped only for sunshine becomes a problem the first time a June evening turns cold, and there is no way to fix it once the event has opened. Ordering the warm layer alongside the tees, in the same run, costs far less than discovering the gap on site.