Lead Times Events Should Plan For

By The Velocity Wear Team

No obligation

Get in touch

Tell us what you need and we reply with pricing, within 1 hour on working days.

50-piece minimum per design ยท Mixed sizes ยท We never share your details

Need this made?Get pricing for this product: free, no obligation, 50 pieces minimum.

Event clothing is built in 10 to 15 working days from artwork approval, with transit after that. Because an event date cannot move, plan on six weeks from enquiry to kit in hand, and target delivery a week before load-in. That buffer is what turns a missing carton into an inconvenience rather than a crew working in their own clothes.

How long before the gates open should you order?

Six weeks for a straightforward run, eight if a sample is involved. The production window is fixed at 10 to 15 working days, but the days either side of it are where events lose control. See what typically goes into an event order on the events and festivals page and how runs are structured on the wholesale page.

Target load-in minus seven days for delivery. Kit arriving on load-in day arrives into the busiest hours the event will have, and nobody is counting cartons while a stage is going up.

Maroon and grey team zip hoodie with a crest and printed name and number, and matching joggers
Night crew need a warm layer, which is a separate design.

What does the 10 to 15 working days cover?

Everything from the point artwork is signed off to the point the order is packed and ready to leave. Cutting, decoration, finishing, quality checks and packing all sit inside that window. It does not cover quoting, artwork revisions, your own approval process or transit.

Working days matter more than they sound. Fifteen working days is three full calendar weeks, and a bank holiday inside that period stretches it further. Plan in working days and convert once, at the end. Our broader explanation of apparel production lead times breaks down where the days actually go.

Which parts of the timeline can you control?

Most of them, which is the useful news. The manufacturing window is fixed, but everything around it responds to how organised the order is.

  • Send print-ready vector artwork first time, rather than a logo lifted from a website.
  • Confirm the size split in one message instead of three, having already asked the crew.
  • Name one person who can approve, so a proof does not circulate for a week.
  • Decide on garment colour before requesting the quote, since a change afterwards restarts the proof.
  • Book the sample early if you want one, because it sits before the production window rather than inside it.

What happens if artwork is late?

The clock has not started. That is the part worth internalising: the 10 to 15 working days runs from approval, so every day artwork sits unapproved is a day added to the total, and none of it can be recovered later.

If the date is genuinely at risk, the levers are to simplify the decoration, to drop the sample step, or to reduce the number of designs so a single run covers the whole team. Cutting from three designs to one also lifts the quantity into a better tier, with discounts reaching 35% at the top, so the compromise is not purely a loss.

For anything seasonal with a fixed date, work from the published deadline rather than from an estimate. Our post on summer events order deadlines applies this count-back to a May or June delivery, which is the busiest window in the event calendar and the one where slippage costs the most. Whatever the season, write the back-schedule down and share it with whoever is approving the artwork, because a date nobody has seen is a date nobody is working to.

Order the crew kit and the merch as one conversation rather than two. Events routinely quote the shirts in March and remember the caps in May, and a second order placed late carries the whole timeline again from the beginning. A single enquiry covering everything the event needs produces one schedule, one delivery and one set of approvals to chase.

Order what you just read about

Every range is made to order from a 50-piece minimum in 10 to 15 working days, with tiered pricing up to 35% off at volume. Price your order or order samples first.

Get a quote

Want to order your custom clothes now?

Tell us what you want made and weโ€™ll reply within 1 hour on working days with pricing. Minimum 50 pieces per design, made in 10 to 15 working days from artwork approval, shipped worldwide.

PNG, JPG, WebP, GIF, SVG, PDF, EPS or PSD. Up to 5 files, 15 MB each. Your files are private and only visible to our team.

Free and no obligation. Want to see the quality first? A sample is ยฃ150 for one or two pieces including worldwide shipping, credited against your bulk invoice.

We use your details only to answer this enquiry. See our privacy policy.

FAQ

Quick Answers

Common questions about wholesale, answered.

The build window is what it is, but scheduling around a known date is possible if the date is stated at the quote stage rather than after artwork has already been approved.

Not materially between 50 and several hundred pieces. Very large runs across multiple designs are scheduled individually, so tell us the total quantity when you ask for the quote.

At artwork approval. Quoting, proofing and your own internal sign-off all happen before it, which is why the realistic plan is six weeks rather than three.

To an office or store you control, a week ahead. Venue deliveries are hard to track, and a carton signed for by a stranger during load-in is a problem you cannot solve on the day.