All articles
Ecommerce 6 September 2026 7 min read

How Many Units Should a US DTC Brand Order First?

By The Velocity Wear Team

Every quantity conversation with a new brand goes the same way. They ask what the minimum is, we say 20 pieces per design, and then they look at the tier pricing and start moving upward — because at 250 the unit price is meaningfully better, and at 500 better still, and the spreadsheet says the margin is beautiful. The spreadsheet is not lying. It is just answering a different question from the one that matters.

The question the tier table does not answer

A volume discount tells you the cost of goods. It says nothing about the cost of goods you do not sell, and for a brand with no sales history that second number is the one with all the risk in it. Unsold inventory is not a smaller profit; it is cash converted into boxes, and boxes are extremely difficult to convert back into cash at anything like the price you paid.

So the real comparison is not "unit price at 100 versus unit price at 500". It is "total cash at risk at 100 versus total cash at risk at 500, given that I currently have no evidence about demand".

A ninety-day test

Here is a usable heuristic for a first run: order what you believe you can sell in ninety days, and then order less than that, because your belief is not evidence yet. If you have an audience — an email list, a following, a waitlist — you have something better than a guess, and you should scale to it. If you do not, you are estimating from nothing, and the correct response to estimating from nothing is to make the estimate cheap to be wrong about.

Twenty pieces per design is not a serious inventory position and it is not meant to be. It is a way to find out whether a design sells at all, in real conditions, with real customers paying real money — which is information no amount of survey or poll will give you.

When scaling up genuinely is right

  • You sold through a previous run of the same design and had to turn away demand. That is evidence, and it is the only kind that counts.
  • You have committed wholesale orders. Somebody else's purchase order is a much better forecast than your own optimism.
  • The design is a core carry-over rather than a seasonal graphic — a plain heavyweight hoodie in black will still be sellable next year in a way a dated graphic will not.
  • You have somewhere to put it that costs nothing, and the cash is genuinely spare. Both halves of that sentence have to be true.

The reorder is the real strategy

The pattern that works for most new brands is small, frequent and responsive rather than large and infrequent. Production is 10 to 15 working days from artwork approval, so a reorder of a proven design is a matter of weeks, not seasons. That turnaround is what makes the small-first approach viable — you are not choosing between a big order and being out of stock for three months.

You will pay more per unit doing it that way. You will also still be trading in a year, which brands that put their entire launch capital into one run of a design nobody wanted frequently are not.

Splitting the difference

If you have three designs and a budget, the instinct is to put the budget into the one you like most. Consider spreading it: three designs at the minimum tells you which one your customers like, which is a different question from which one you like, and the answer is very often surprising. Then put the reorder behind the winner at a real quantity.

That is a more expensive first run per unit and a much cheaper mistake. See the size split guide for how to weight the quantities inside each design once you have decided how many designs to run.

Ready to order?

Every range is made to order from a 20-piece minimum in 10–15 working days, with tiered pricing up to 40% off at volume. Price your order or order a sample pack first.

FAQ

Quick Answers

Common questions about ecommerce — answered.

Twenty pieces per design, with mixed sizes included inside that minimum. It exists so a first run can function as a genuine market test rather than a commitment.

Only if you have evidence of demand. A discount on stock that does not sell is not a saving — it is cash converted into inventory at a price you cannot reverse.

Production runs 10 to 15 working days from artwork approval, and a reorder of an approved design skips most of the setup, so restocking a proven seller is a matter of weeks rather than a season.

For a first run, several at the minimum usually teaches you more. Which design your customers buy is a different question from which one you prefer, and the reorder is where you back the answer.

Bring your idea to life

Premium custom apparel from a 20-piece minimum, made and shipped to the UK, USA, Europe and worldwide. Send your design for a free, itemised quote.

Keep reading