Delivery worldwide from Pakistan+44 7367 067226info@velocity-wear.com

Delivery worldwide from Pakistan

T-Shirts 19 September 2026 4 min read

Ordering T-Shirts for the New Year Rush

By The Velocity Wear Team

No obligation

Get in touch

Tell us what you need and we reply with pricing, within 1 hour on working days.

50-piece minimum per design ยท Mixed sizes ยท We never share your details

Need this made?Get pricing for this product: free, no obligation, 50 pieces minimum.

If shirts have to be ready for a January intake, order in November. Production is 10 to 15 working days from artwork approval, and the last two weeks of December take working days out of that count in a way a calendar view hides. Ordering in the first week of January means shirts in late January, by which point the rush you were kitting out has already started.

What does the festive shutdown do to the count?

A lead time quoted in working days is not the same as a lead time in calendar days, and December is where that gap becomes expensive. Between the public holidays and the days most operations close around them, the last fortnight of the year can contain fewer than half the working days a normal fortnight does. Transit slows for the same reason. So a build that takes three calendar weeks in October can take five across the turn of the year.

The way to sidestep it entirely is to have the shirts delivered before the shutdown rather than through it. Approve artwork in the first half of November, take delivery in early December, and store the cartons. You are trading a few weeks of shelf space for complete certainty on a date you cannot move.

Sage tee, front and back, with a ripple on the chest and two koi circling a whirlpool across the back
A single-design run printed ahead of a January intake.

How big should the first run be?

January volumes are a guess, because you are ordering against people who have not signed up yet. The minimum is 50 pieces per design with sizes mixed freely inside it, so 50 is the floor you can test at. That is the right number if this is a new programme and you genuinely do not know the uptake.

If it is a repeat of something you ran last year, use last year's actuals and go up a tier deliberately, because the price steps at 50 to 99, 100 to 249, 250 to 499, 500 to 999 and 1,000 plus, and the discount reaches 35% off the 50-piece rate at the top. A gym ordering 90 shirts is paying the entry rate for the sake of ten pieces. From-prices, starting at ยฃ11 for t-shirts, are on the wholesale t-shirts page.

Should the design carry the year?

Almost never. A shirt printed with a specific year is a shirt you cannot reorder, cannot carry into February and cannot sell in the summer. For a January campaign, the shirt is usually doing brand work rather than commemorating an event, and a clean logo or slogan design survives the whole year. Keep the dated version for the things that genuinely are once-off, like a specific event with its own name.

The same logic applies to colourways. Every colourway that needs its own screens is a separate run of 50, so a three-colour January launch is a 150-piece commitment before you have sold anything. Launch on one colour, see what moves, and add the second in February when you have data instead of hope.

Is there time to sample in November?

Yes, and November is exactly when to do it. The ยฃ150 sample is credited against the bulk order, so for a buyer who proceeds it is not a separate cost so much as a deposit. In a compressed seasonal window it does one important thing: it removes the possibility of a surprise after the point at which a redo is impossible. Full details are on the samples page.

Order it in October if you can, so that any change to the artwork happens before the production booking rather than after it. The sequence from enquiry through to delivery, and where the sample slots into it, is set out in your first bulk t-shirt order. If you are also running a December product, plan the two together using the deadline maths in ordering t-shirts for Christmas, because they share a production window.

Order what you just read about

Every range is made to order from a 50-piece minimum in 10 to 15 working days, with tiered pricing up to 35% off at volume. Price your order or order samples first.

Get a quote

Want to order your custom clothes now?

Tell us what you want made and weโ€™ll reply within 1 hour on working days with pricing. Minimum 50 pieces per design, made in 10 to 15 working days from artwork approval, shipped worldwide.

PNG, JPG, WebP, GIF, SVG, PDF, EPS or PSD. Up to 5 files, 15 MB each. Your files are private and only visible to our team.

Free and no obligation. Want to see the quality first? A sample is ยฃ150 for one or two pieces including worldwide shipping, credited against your bulk invoice.

We use your details only to answer this enquiry. See our privacy policy.

FAQ

Quick Answers

Common questions about t-shirts, answered.

It is tight. Fifteen working days spanning the festive period can stretch to five calendar weeks once holidays and slower transit are counted, so a December order is realistically a February delivery.

It is the minimum and it is a reasonable test quantity for a new programme. Sizes can be split freely inside the 50, so you can weight the curve towards the middle and learn what your intake actually takes.

Yes, but each colourway needing its own screens counts as a separate run of 50 pieces. A reorder in a new colour is a new 50, not a top-up of the original order.

Yes. The ยฃ150 is credited against the bulk order regardless of which tier you land in, including at the 50-piece minimum.

Keep reading