T-Shirts 19 September 2026 4 min read

T-Shirts for Events: lead time

By The Velocity Wear Team

Get in touch

No obligation

Tell us what you need and we reply with pricing, usually within hours on working days.

50-piece minimum · Mixed sizes · We never share your details

Event t-shirts are produced in 10-15 working days from artwork approval, with delivery transit on top. Because an event date cannot be moved, the sensible plan is to have shirts in hand at least two weeks before the date rather than the day before. That means approving artwork roughly six weeks out, and starting the design conversation earlier than that.

How far ahead should the order go in?

Count backwards from load-in, not from the event itself, because crew shirts are needed before the gates open. A workable schedule for a single-date event looks like this, and it has slack built in on purpose.

  1. 1Eight weeks out: lock the design, including every sponsor and partner logo that has to appear.
  2. 2Seven weeks out: order a sample if the garment or fit is new to you.
  3. 3Six weeks out: approve production artwork. The 10-15 working day window starts here.
  4. 4Three to four weeks out: shirts arrive, are counted, and are split into crew boxes and merch boxes.
  5. 5Load-in: crew shirts go out on site, merch goes to the stall already sorted by size.
Boxed event crew t-shirts ready for load-in
Shirts should arrive with weeks to spare, not days.

What does the production window actually cover?

Cutting in the sizes ordered, making screens or transfer files per colour and design, decorating each position, curing, checking and packing. It runs from artwork approval because that is the point at which the screens can be made - everything before approval is preparation, and it is entirely within your control. Our wholesale t-shirts page is where to start the quote once the design is settled.

Where do event orders lose days?

Sponsors. An event shirt often carries several partner logos, and the last one always arrives late and in the wrong file format. Events also lose time to line-up changes that alter a back print, and to a merch quantity that nobody wants to commit to until ticket sales are clearer. The fix for the first two is a hard artwork cut-off written into the sponsor agreements. The fix for the third is deciding a quantity you are comfortable holding, because the cost of running out at the stall is higher than the cost of a few unsold shirts - event size splits covers how to spread them.

What if you are running two dates?

Order for both on one run if the design allows it. Two runs means two production windows, two lots of setup, and the second one priced in a lower quantity band. If the artwork has to carry a date, consider putting the date in a small secondary position or leaving it off entirely so the same shirts serve both. A tour-style approach, where one core design covers multiple dates, is covered in band merch for UK tours.

What do you do if the date is close already?

Simplify and approve fast. Fewer colours, one print position, one garment colour, no personalisation - each of those removes work and removes reasons for the proof to bounce back. Do not approve artwork you have not checked properly just to start the clock; a reprint costs the whole window again, and there is no second chance on an event date. The events and festivals page sets out what event buyers usually order, and event t-shirt cost shows what simplifying does to the per-piece figure.

Order what you just read about

Every range is made to order from a 50-piece minimum in 10–15 working days, with tiered pricing up to 35% off at volume. Price your order or order samples first.

FAQ

Quick Answers

Common questions about t-shirts — answered.

That window is the production time we quote and we do not offer shorter turnarounds. The days most events save come from approving artwork promptly and cutting the number of colours and positions in the design.

It is simpler if they do, but crew shirts are needed at load-in while merch is needed at gates. Ordering both on one run and splitting the boxes on arrival avoids two production windows and two deliveries.

After production finishes. We deliver to the UK, USA and Europe, and the transit leg is separate from the 10-15 working days, so it needs its own line in the plan rather than being assumed inside the window.

Before artwork approval. Adding a logo afterwards means new screens and a restart of that stage, which on a fixed event date is the change most likely to cause a genuine problem.

Want to order your custom clothes now?

Tell us what you want made and we’ll reply within hours with pricing. Minimum 50 pieces per design, made in 10 to 15 working days from artwork approval, shipped worldwide.

Free and no obligation. Want to see the quality first? A sample is £150 for one or two pieces including worldwide shipping, credited against your bulk invoice.

Keep reading