How to Plan a Clothing Drop: Timeline and Checklist

By The Velocity Wear Team

No obligation

Get in touch

Tell us what you need and we reply with pricing.

We no longer offer samples. Instead, a first clothing order can be a small production run from 20 pieces per design, priced in your quote. How it works

Leave it unticked and we may email you now and then about offers on products like the ones you ask about. Every email has an unsubscribe link. Privacy policy

50-piece minimum per design · Mixed sizes · We never share your details

Need this made?Get pricing for this product: free, no obligation, 50 pieces minimum.

Work backwards from your launch date. Production runs around 10–15 working days from artwork approval for screen printing and embroidery, or nearer 15–20 for sublimation and complex jobs, plus 2–5 working days tracked UK delivery — and you need stock in hand before photography, which happens before marketing.

The Sequence That Actually Works

Most drop problems come from doing things in the wrong order. You cannot photograph a product you do not have, you cannot market convincingly without photography, and you cannot build anticipation in three days. The dependencies run in one direction, and the whole timeline is determined by production lead time at the front of it.

Six to Eight Weeks Out

Finalise the design and specification. Decide garment, fabric weight, colourway, decoration method and quantity. If this is a new design or a new blank, this is when to order a small run at the 50-piece minimum to check the product in hand — that step is far cheaper now than a correction later. Establish your Pantone references and prepare vector artwork.

Four to Five Weeks Out

Approve artwork and place the main order. Remember the production clock starts at artwork approval, so proofing delays come out of your buffer. Model your quantity in the free instant price calculator first — bulk discounts reach up to around 35% as volumes rise, and the difference between your planned quantity and a slightly larger one is often smaller than expected.

Two Weeks Out: Stock Arrives

This is when the rest of the plan becomes possible.

  • Shoot the product properly — on a body, in natural light, showing scale and fabric. Flat-lay-only photography consistently undersells apparel.
  • Check the delivered order against your specification before announcing anything.
  • Write product descriptions with actual garment measurements, not just size letters.
  • Prepare packaging and test your dispatch process on a dummy order.

One to Two Weeks Out: Build Anticipation

Anticipation cannot be created on launch day. Tease the product, announce the date and time explicitly, and give people a reason to be there at the start — limited quantity is the honest one if it is true. Collect emails from anyone interested, because an owned list is the only launch-day channel you fully control.

“"A drop that nobody knew was coming is just a product going on sale."”

Launch Day

Be available. Things go wrong on launch day — a listing with the wrong price, a size that sells out immediately, a payment issue — and being present to fix them within minutes rather than hours is worth more than any pre-planning. Dispatch quickly; the gap between purchase and delivery is where early customer goodwill is won or lost.

After the Drop

Record what actually happened: which sizes sold out first, which colourway moved, how long it took, what people asked about. That data shapes the next order far better than instinct will. If a design sold through, reorder at a quantity that benefits from bulk discounts — and preview any changes in the free Design Studio before approving artwork again.

Ready to order?

Every range is made to order from a 50-piece minimum in 10 to 15 working days, with tiered pricing up to 35% off at volume. Price your order, or start with a 20-piece first run: we don’t make samples.

Get a quote

Want to order your custom clothes now?

Tell us what you want made and we’ll reply with pricing. Minimum 50 pieces per design, made in 10 to 15 working days from artwork approval, shipped worldwide.

Production is 10 to 15 working days after you approve the proof, plus shipping.

We no longer offer samples. Instead, a first clothing order can be a small production run from 20 pieces per design, priced in your quote. How it works

Leave it unticked and we may email you now and then about offers on products like the ones you ask about. Every email has an unsubscribe link. Privacy policy
Message on WhatsApp

Free and no obligation. Want to see the quality first? We don’t make samples, but a first order of clothing can be 20 pieces per design, priced in your quote.

We use your details to answer this enquiry and, unless you tick the box above, for occasional offers. See our privacy policy.

FAQ

Quick Answers

Common questions about marketing, answered.

Six to eight weeks. Production takes around 10–15 working days from artwork approval for screen printing and embroidery, or 15–20 for complex jobs, plus 2–5 working days delivery — and photography and marketing can only happen once stock is in hand.

At artwork approval, not order placement. Any delay in proofing extends your timeline rather than being absorbed by it, so approve proofs promptly.

Photograph the product on a body in natural light, check the delivered order against your specification, write descriptions with real garment measurements, and test your dispatch process before it matters.

Start one to two weeks out — tease the product, announce the exact date and time, and collect emails. An owned email list is the only launch-day channel you fully control.