Wholesale 19 September 2026 4 min read

Delivering Bulk Orders to the USA

By The Velocity Wear Team

Get in touch

No obligation

Tell us what you need and we reply with pricing, usually within hours on working days.

50-piece minimum · Mixed sizes · We never share your details

Bulk orders ship to US addresses regularly, and the planning is the same three-part sum every time: 10 to 15 working days of production from artwork approval, then transit, then whatever it takes for the receiving end to actually accept a bulk shipment. The third part is the one that catches buyers out, and it is entirely within your control if you settle it before you order.

What is a realistic timeline to a US address?

Treat the production window as fixed and everything else as a range. Transit to the USA varies with the service chosen, and an air shipment and a sea shipment are different orders of magnitude in both time and cost. The practical approach is to decide which of those you are buying at quote stage, because the decision is driven by your deadline rather than by the garments. A brand launching a product has flexibility; a company kitting out a trade stand on a fixed date does not, and should say so early.

Do not plan to the earliest possible arrival. Plan to a date you can defend, and keep a few days between the expected arrival and the moment the garments are needed. If they land early, nothing is lost.

How does the shipment get priced?

Separately from the garments, on weight, volume, destination and service level. That is why shipping should appear as its own line on the quote rather than being absorbed into the per-piece figure — you cannot compare two suppliers if one has hidden freight inside the unit price. Clothing is light but bulky, so volume often drives the cost more than weight does, and a heavier product like a tracksuit at $53 per set ships very differently from a run of caps. The per-piece side of the arithmetic is on the pricing page.

Custom tracksuit range boxed and ready for bulk shipment to the USA
Bulk clothing is light and bulky, so volume usually drives the freight cost.

Which address details matter most?

The ones about receiving rather than the ones about location. Can the site take a pallet? Is there a loading dock, or does the delivery need a lift gate? What are the receiving hours, and is there a named person who will be there? A residential address or a small office that cannot accept a freight delivery turns an on-time shipment into a depot storage problem. Give a phone number that gets answered, because carriers call before delivery and a missed call costs a day.

Also confirm the legal name of the receiving business and any registration details required for the import, and make sure they match the commercial paperwork exactly. Mismatches are the single most avoidable cause of a hold. The equivalent European checks are in delivering bulk orders to Europe.

What if the deadline will not move?

Then work backwards from it out loud, with the supplier, before anything is ordered. Name the date, subtract the receiving buffer, subtract transit, subtract the 10 to 15 working day production window, subtract the sample round and the artwork approvals, and look at the date you land on. If that date has already passed, the honest answers are to change the deadline, reduce the scope, or pay for a faster shipping service — not to hope. Order quantity is also part of the lever: a smaller run moves faster through every stage. The range and the starting prices are on the wholesale page, and the shape of a launch calendar is set out in planning a first clothing drop.

Ready to order?

Every range is made to order from a 50-piece minimum in 10–15 working days, with tiered pricing up to 35% off at volume. Price your order or order samples first.

FAQ

Quick Answers

Common questions about wholesale — answered.

Yes, alongside the UK and Europe, and invoicing can be handled in the currency your accounts run in from the seven we bill in.

It depends entirely on your deadline and the size of the order. Decide it at quote stage rather than after production, because it changes both the cost and the date you should be planning to.

Say so before the shipment is booked so an appropriate service can be arranged. A site that cannot accept freight will refuse the delivery, and recovering from that costs more time than arranging it correctly would have.

Often yes, though it affects the freight quote and each shipment carries its own paperwork. Raise it with the quote rather than once production has started.

Want to order your custom clothes now?

Tell us what you want made and we’ll reply within hours with pricing. Minimum 50 pieces per design, made in 10 to 15 working days from artwork approval, shipped worldwide.

Free and no obligation. Want to see the quality first? A sample is £150 for one or two pieces including worldwide shipping, credited against your bulk invoice.

Keep reading