Printing 11 June 2025 7 min read

Custom Clothing Printing in Gloucester and Gloucestershire

By The Velocity Wear Team

Get in touch

No obligation

Tell us what you need and we reply with pricing, within 1 hour on working days.

50-piece minimum per design · Mixed sizes · We never share your details

Need this made?Get pricing for this product— free, no obligation, 50 pieces minimum.

For custom clothing printing in Gloucester, rugby club kit and embroidered engineering workwear are the two largest requirements. Velocity Wear produces both from a 50-piece minimum with mixed sizes, delivered across Gloucester, Cheltenham and Gloucestershire on a tracked service.

Rugby Kit Is a Durability Problem

Gloucestershire's rugby culture runs deep, from the professional game down through a dense network of community clubs. Match kit takes more punishment than almost any other team garment — gripped, pulled, dragged through mud and washed hot after every fixture. That rules out surface decoration: a printed number or sponsor logo will not last a season. Sublimation puts the design into the polyester itself, leaving nothing on the surface to lift, which is why it dominates match shirts.

Building the Club Range

A club needs four things with genuinely different requirements.

  • Match shirts — sublimated polyester, numbered, with sponsor placement fixed in writing before artwork approval.
  • Training kit — ordered in greater quantity than match kit because it is worn far more often.
  • Coaching and touchline wear — embroidered softshells and fleeces, specified for standing in weather rather than playing.
  • Club leisurewear — embroidered polos and hoodies sold to members and supporters, often funding the rest of the range.

Sponsors Are the Usual Delay

Almost every late club kit order traces to the same cause: sponsors confirm late, send low-resolution files, or change placement after proofing, while the season start does not move. Collect every sponsor asset before starting artwork, confirm placement in writing, and check each logo at actual size. Sublimated kit sits at the longer end of production at around 15–20 working days from artwork approval, plus 2–5 working days delivery — so the margin for late artwork is smaller than it looks.

Engineering and Rural Work

Gloucestershire's aerospace and engineering cluster orders embroidered polos, fleeces and softshells for daily wear — a durability specification where stitch outlasts print under frequent hot washing. Beyond the towns, the county's rural and land-based businesses order gilets, fleeces and softshells in darker colourways for year-round outdoor work.

“"A club can control its design, its budget and its deadline. It cannot control the sponsor, so ask them first."”

Minimums and Consolidation

Orders start at 50 pieces with sizes mixed freely inside the run, which suits a squad with a wide size range. Bulk discounts reach up to around 35% as quantities rise, so a club ordering all four categories in one run — or coordinating across age groups — reaches a materially better per-piece cost and keeps kit consistent between sides. Model it in the free instant price calculator and preview the full layout in the free Design Studio before approving.

Order what you just read about

Every range is made to order from a 50-piece minimum in 10–15 working days, with tiered pricing up to 35% off at volume. Price your order or order samples first.

Want to order your custom clothes now?

Tell us what you want made and we’ll reply within 1 hour on working days with pricing. Minimum 50 pieces per design, made in 10 to 15 working days from artwork approval, shipped worldwide.

PNG, JPG, WebP, GIF, SVG, PDF, EPS or PSD. Up to 5 files, 15 MB each. Your files are private and only visible to our team.

Free and no obligation. Want to see the quality first? A sample is £150 for one or two pieces including worldwide shipping, credited against your bulk invoice.

We use your details only to answer this enquiry. See our privacy policy.

FAQ

Quick Answers

Common questions about printing — answered.

Because it puts the design into the polyester rather than onto it, leaving nothing on the surface to lift. Printed numbers and sponsor logos generally will not survive a season of gripping, mud and hot washing.

Sponsor artwork — late confirmation, low-resolution files, or placement changes after proofing. Collecting it before starting the design is the most effective protection for a season-start deadline.

Around 15–20 working days from artwork approval, plus 2–5 working days tracked delivery — longer than screen printing or embroidery.

50 pieces per order with mixed sizes allowed inside the run. Bulk discounts reach up to around 35% as quantities rise.

Keep reading