Sports Clubs: Summer Events Order Deadlines
By The Velocity Wear Team
For a May or June event, artwork needs approving about four weeks before the date: transit, then 10-15 working days of production, then nothing spare. Because clubs need time to gather sponsor files and squad sizes, the realistic start is eight weeks out. An event date is fixed, so every day lost at the front is a day lost at the end.
When does a May or June event need its order placed?
March for a May date, April for a June one, if the club already has artwork and sizes ready. If it does not, move both back by a month. The mistake almost every committee makes is treating the production window as the whole lead time, when it is only the part that happens after everything else is settled.
Summer events also cluster, which means the weeks before them are the busiest for everyone. Ordering early is not only about your own schedule. The garments we make for squads and supporters are set out on the sports clubs page.

How do you count back from a fixed fixture date?
In four steps, each with its own owner. Transit is the supplier and carrier. The 10-15 working day build is the factory. Proofing is shared. Everything before that is the club, and it is the block that decides whether the plan works.
- 1Write down the date the kit must be in hand, which is before the event, not on it.
- 2Subtract transit to your delivery address.
- 3Subtract fifteen working days, using the top of the production range.
- 4Subtract the club time for artwork, sizes and sign-off, which is usually the longest block.
Hitting the date exactly is not the goal; having a week of slack is. Planning apparel lead times so you never air freight makes the case for building that buffer in deliberately rather than hoping for it.
What can still be changed once the count has started?
Before artwork approval, almost everything: garment, colour, size split, quantity. After approval, very little, because the production window opens at that point and changes mean new setup. Sponsors are the usual cause of a late change, so a sponsor still under negotiation is a reason to leave that position off the design.
Quantity is worth settling early for a second reason. An event order is a chance to move up a tier, where the rate falls as far as 35% from the 50-piece price, and supporters buying alongside the squad is what gets a club there. That needs deciding before the order, not after.
Should event kit be a separate design from season kit?
Only if the event genuinely needs it, because a separate design carries its own fifty-piece minimum. Many clubs use the season design with an added sleeve print for the event, which keeps it inside one run. If a distinct event shirt is wanted, budget for fifty pieces and plan the size split the way you would for any club order, as set out in sizing a clothing order for sports clubs. The full range is on the wholesale overview.
What if the event quantity is uncertain?
Take pre-orders with payment attached and close them on a date that leaves the schedule intact. An expression of interest is not a quantity, and clubs that order against one routinely find the enthusiasm did not convert. Paid pre-orders give you a real number to commit against, and anything above fifty is a bonus rather than a risk.
If interest is genuinely unpredictable, order the floor and treat the surplus as stock to sell at the event itself. Fifty pieces of a plain crested tee will sell over a summer even if the specific event underdelivers, whereas a garment printed with a date and a fixture cannot be sold anywhere afterwards. Keep the dated version small or leave the date off entirely.