Ordering Polo Shirts for Black Friday
By The Velocity Wear Team
Black Friday stock has to be in your building before the week opens, not in production during it. Working back from the last Friday in November through delivery transit, 10 to 15 working days of production and an artwork approval window, the enquiry wants to be placed in September. If you also need photography and listings built, add another fortnight in front of that.
Why is the Black Friday deadline earlier than the date suggests?
Because the promo is a selling window, not a delivery date. Everything has to exist before the first order lands: stock on the shelf, product photographs taken on the real garment, listings written, sizes counted. A Christmas staff order only needs the boxes open on the day of the party. A Black Friday drop needs the boxes open, unpacked, photographed and counted several weeks earlier.
That extra front-loading is what catches people out. Fifteen working days of production from approval is three calendar weeks. An artwork conversation is another week. Transit to a UK warehouse is a few days, more to the USA or across Europe. Stack those and a late-November promo is a September enquiry with room to breathe, or an early-October one with none.

How many should you order for a promotion?
The minimum is fifty pieces per design, sizes mixed however you want inside that. For a first promotion, fifty of one strong colourway usually beats twenty-five each of two, because a split run is two designs and therefore two minimums, and because a sold-out single colour is a better story than two half-sold ones.
If you already have sales history, use it rather than a rule of thumb, and weight the curve towards the middle sizes that always clear first. Quantity is also where the pricing moves: the tiers run 50–99, 100–249, 250–499, 500–999 and 1,000-plus with up to 35% off the fifty-piece price at the top end, so a promotion planned at scale changes the margin before you set the discount.
What should the garment itself be?
Something that still sells in January. Black Friday buyers are price-led, which makes it tempting to order the thinnest garment available, but a polo bought at a discount and worn once is a customer who does not come back. A solid piqué with a proper ribbed collar and a clean chest mark survives contact with a returns policy. Performance knits work for a sports-led audience if the decoration is specified to suit them.
Decide the packing at the same time, because promo week is a fulfilment problem as much as a stock one. Individually bagged pieces in size-run cartons go straight to the picking bench; loose stock has to be sorted first. That is covered in how bulk polo shirts are packed, and the fabric and collar options are on the wholesale polo shirts page.
Where does a sample fit into a promo timeline?
Before photography, which is the real reason to order one. A sample at £150, credited against the bulk order, gives you a physical garment to shoot listings on weeks before the run exists. The samples page covers what arrives and how long the build takes, and building it into the September plan is what turns the sample from a delay into a head start.
Buyers running a promotion straight into a festive order should line the two timelines up in one calendar rather than two, since the production slots sit back to back. Ordering polo shirts for Christmas sets out that second count.



