Delivery worldwide from Pakistan+44 7367 067226info@velocity-wear.com

Delivery worldwide from Pakistan

Wholesale 19 September 2026 3 min read

Gyms: the New Year Rush Order Deadlines

By The Velocity Wear Team

No obligation

Get in touch

Tell us what you need and we reply with pricing, within 1 hour on working days.

50-piece minimum per design ยท Mixed sizes ยท We never share your details

Need this made?Get pricing for this product: free, no obligation, 50 pieces minimum.

For kit on the floor in the first week of January, place the order in November. The build runs 10 to 15 working days from artwork approval, delivery transit sits on top of that, and artwork rarely gets signed off on the first attempt. November gives you room for one round of changes without the date moving.

When is the last safe date to order for January?

Work back from the day new members walk in, not from the first of the month. If your intake really starts on 2 January, you want stock in the building before Christmas, because nobody is unpacking cartons on New Year's Eve. That pulls the delivery target into the third week of December. Subtract transit, subtract 15 working days of build, subtract a week for approval, and you land in the first half of November.

The end of the year compresses this further than most buyers expect, because working days are not calendar days and December has fewer of them. A November order is not caution, it is arithmetic.

Olive Mystic premium tracksuit, front view (PT-03)
A tracksuit set counts as one design against the 50-piece minimum.

What does the November timeline look like week by week?

  1. 1Early November: decide the garments and the size split, and send artwork.
  2. 2Mid November: approve the artwork, which is the moment the 10 to 15 working day clock starts.
  3. 3Late November to early December: the run is built and finished.
  4. 4Mid December: transit, delivery and a size check against your order before the holidays.

If you want a physical sample in that sequence, add it at the front rather than the back. The ยฃ150 sample is credited against the bulk order, so it costs you time rather than money, but only if you ask for it in October.

What usually slips, and how much buffer covers it?

Artwork. Almost always artwork. A logo supplied as a screenshot rather than a vector, a colour nobody can agree on, or a version that has to go past an owner who is on holiday. Two weeks of slack at the front of the schedule absorbs all of that; two days does not. The wider pattern is covered in planning lead times so you never air freight.

The second common slip is quantity. A gym decides in late November to add a second colour, which is a second design and therefore a second 50 pieces, and the new run starts its own clock rather than joining the one already moving.

Should staff kit and member merch go in together?

If the artwork is identical, yes, and the combined quantity pushes you further down the tiers, where the discount reaches up to 35% of the 50-piece price. If the staff version carries a different mark or a different colourway, it is a separate design with its own minimum, and you should still place both in the same week so they run side by side rather than a fortnight apart.

Most gyms split the January order into a heavier staff layer and a lighter member piece. Our gyms and fitness page lists what we hold in each, and the wholesale range shows where the from-prices sit before the tiers apply.

Ready to order?

Every range is made to order from a 50-piece minimum in 10 to 15 working days, with tiered pricing up to 35% off at volume. Price your order or order samples first.

Get a quote

Want to order your custom clothes now?

Tell us what you want made and weโ€™ll reply within 1 hour on working days with pricing. Minimum 50 pieces per design, made in 10 to 15 working days from artwork approval, shipped worldwide.

PNG, JPG, WebP, GIF, SVG, PDF, EPS or PSD. Up to 5 files, 15 MB each. Your files are private and only visible to our team.

Free and no obligation. Want to see the quality first? A sample is ยฃ150 for one or two pieces including worldwide shipping, credited against your bulk invoice.

We use your details only to answer this enquiry. See our privacy policy.

FAQ

Quick Answers

Common questions about wholesale, answered.

Sometimes, but it removes every buffer and leaves no room for an artwork revision, so the build has to go through clean on the first pass.

No. The 10 to 15 working days is the production build from artwork approval, and transit to the UK, USA or Europe is added after that.

Fifty pieces per design, with sizes mixed freely inside that fifty, so one hoodie design across a full size run meets the minimum on its own.

You can, but a mid-January reorder lands in February at the earliest, so it is usually better to size the November run slightly long.

Keep reading