Lead Times Trades Should Plan For

By The Velocity Wear Team

Get in touch

No obligation

Tell us what you need and we reply with pricing, usually within hours on working days.

50-piece minimum · Mixed sizes · We never share your details

Budget 10-15 working days of production from the point you approve artwork, then add delivery transit on top. For a site start date, working backwards means allowing three weeks for the build and transit and another few days for proofing. Firms that miss a date almost always lost the time at the artwork stage, not on the production floor.

How long does a trades order take from approval?

The clock starts when the proof is signed off, not when the purchase order arrives. From there the run takes 10-15 working days regardless of whether it is fifty pieces or five hundred, because the setup, the print or stitch run and the finishing are the same sequence at both ends of that range.

Transit is separate and depends on destination. We ship to the UK, the USA and Europe, and the difference between those routes is days rather than weeks, but it is real and it belongs in the plan. The construction and trades page sets out what we produce, and the wholesale overview covers how orders are placed.

Branded workwear jackets arranged for a trades clothing order
Jackets are quoted per job rather than at a fixed from-price.

When should the order go in for a site start date?

Count backwards in four blocks. Delivery transit, then the 10-15 working day build, then two to four days for proofing and approval, then however long your own sign-off takes. For most firms that totals around four calendar weeks, and the internal sign-off is the block that varies most.

  1. 1Fix the date the crew needs the kit in hand.
  2. 2Subtract transit for your delivery country.
  3. 3Subtract 15 working days for the build, using the top of the range rather than the bottom.
  4. 4Subtract your own approval time, which is usually longer than you think.

Long-running contracts make this easier, because the kit date is known months ahead. Short-notice work is where the pressure lands, and the answer there is stock held from the previous run rather than a rushed order. Apparel production lead times explained covers the same sequence in more detail.

What pushes a build past fifteen days?

Artwork supplied at low resolution, a logo with no vector original, a colour reference given as a screenshot, or a proof that sits unanswered for a week. None of those are production problems and all of them stop the clock. Sending a clean vector file with the placement and size marked removes most of the risk in one email.

Changing the spec mid-run is the other cause. Adding a second garment colour or moving a logo after approval restarts part of the process, and on a trades order that often means the outer layer arrives after the base layer. Building a buffer into the plan, as set out in planning apparel lead times, is cheaper than expediting.

Does a bigger order take longer to make?

Not proportionally. A run of five hundred sits inside the same 10-15 working day window as a run of fifty, because the time is dominated by setup, curing and finishing rather than by piece count. That is one more reason to consolidate a year of buying into a single order: it is the same wait and a better price, up to 35% off the 50-piece rate at the top tier.

What can be prepared before the order is placed?

Nearly everything that later causes delay. Have the logo as a vector file with a colour reference attached, decide the placement and the size in millimetres, agree the garment and base colour, and collect the crew sizes. Those four items take an afternoon and they remove the majority of the proofing exchange, which is where days quietly disappear on a first order.

Name the approver too. A proof that needs three people to agree takes as long as the slowest of them, and on a firm where everyone is on site during the day that can be a week on its own. One person with authority to reply the same day is worth more to the delivery date than any expediting a supplier can offer.

Order what you just read about

Every range is made to order from a 50-piece minimum in 10–15 working days, with tiered pricing up to 35% off at volume. Price your order or order samples first.

FAQ

Quick Answers

Common questions about wholesale — answered.

No. The 10-15 working days covers production only, and transit to your delivery address is added on top. Plan the two separately so a shipping delay does not eat the whole buffer.

Some of the time, depending on what is already scheduled and how simple the decoration is. Ask before you place the order rather than after, because the answer changes what garment and method we would recommend.

The production window does not open until approval, so every day the proof waits is a day added to the delivery date. Nominating one person to sign off is the fastest fix most firms make.

Treat the £150 sample as a separate cycle before the bulk run rather than part of it. It is worth the extra weeks on a first order, and the fee is credited against the bulk order afterwards.

Want to order your custom clothes now?

Tell us what you want made and we’ll reply within hours with pricing. Minimum 50 pieces per design, made in 10 to 15 working days from artwork approval, shipped worldwide.

Free and no obligation. Want to see the quality first? A sample is £150 for one or two pieces including worldwide shipping, credited against your bulk invoice.

Keep reading