Wholesale 19 September 2026 4 min read

Agencies: Trade Show Season Order Deadlines

By The Velocity Wear Team

Get in touch

No obligation

Tell us what you need and we reply with pricing, usually within hours on working days.

50-piece minimum · Mixed sizes · We never share your details

Aim to have trade show kit in hand a week before the stand goes up. Counting back from that, allow delivery transit, then 10 to 15 working days of production from artwork approval, then however long your client takes to sign off the design. For most agencies that puts the order deadline six to seven weeks ahead of the show, and the artwork deadline earlier still.

When does the order have to be placed for a trade show?

Take the first day of the show and subtract seven days, because kit that arrives the day before leaves no room to swap a wrong size or reprint a damaged box. From that date, subtract delivery transit for wherever the stand is. Then subtract the production window: 10 to 15 working days, which is two to three calendar weeks once weekends are out. Use 15, not 10, because a plan built on the best case is not a plan.

What remains is the artwork approval date, and that is the one an agency actually controls. Everything downstream only starts once the design is signed off, so an approval that slips by four days moves the delivery by four days. Book the kit through the wholesale catalogue once you know the product, and use the corporate and agency page to line up staff clothing and giveaway items on the same timeline.

How do you count back from a fixed stand date?

Write the chain out in the order it happens rather than in your head. Artwork approval, production, transit, buffer, show. Put a calendar date on each boundary and share it with the client at brief stage, because a printed schedule makes the cost of a late decision obvious in a way that a verbal warning does not. The mechanics of the production window itself are set out in apparel production lead times explained.

Trade show season compresses this further, since several shows in a quarter tend to share one round of client sign-off. If three events sit within eight weeks of each other, treat them as a single buying decision. Combining them usually drops the total into a better tier — pricing steps at 50–99, 100–249, 250–499, 500–999 and 1,000+ pieces, reaching up to 35% below the 50-piece price — and it removes two rounds of approval from your schedule.

Embroidered cap in a branded colourway for exhibition staff
Caps are a common stand giveaway and carry embroidery cleanly.

What slips first on a show order?

In our experience the schedule almost never breaks in production. It breaks at the point where a client's brand guardian sees the mockup for the first time and asks for the logo to sit 10mm higher. Build that review into the plan as its own stage, and insist on a named approver rather than a committee. If the client wants a physical check before committing, the £150 sample is the mechanism, and it is credited against the bulk order when it goes ahead — but it adds its own round trip, so book it early rather than as a last-minute reassurance.

Sizing is the second thing to slip. Staff lists for a stand change up to the last fortnight, which is fine: the 50-piece minimum is per design and sizes mix freely inside it, so you can leave the size split late even after the artwork is locked. That is the one flexible lever in the whole chain, and it is worth protecting by not spending it early.

Should you order spares for the stand?

Yes, and the minimum makes it cheap to do so. Since you are ordering 50 pieces of a design anyway, a stand crewed by eight people leaves plenty of headroom for giveaways, replacements and the second day when someone spills coffee down the front. Order the extra sizes at the ends of the range rather than more mediums, because a wrong-size XL on a stand is visible from across the hall.

Plan for what happens to the surplus too. Kit with a show date printed on it is landfill on the Monday after; kit with only the client's brand on it goes into the next event, which is what makes a genuine reorder possible. Keep the dated detail on a swing tag or a bag insert instead of on the garment itself.

Order what you just read about

Every range is made to order from a 50-piece minimum in 10–15 working days, with tiered pricing up to 35% off at volume. Price your order or order samples first.

FAQ

Quick Answers

Common questions about wholesale — answered.

The production window starts at approval, so a late sign-off moves delivery by the same number of days. Nothing recovers that except cutting the buffer, which is the part you least want to spend.

It can, and it usually costs less per piece because the combined quantity may reach a higher discount tier. It also removes a second round of client approval from your calendar.

We deliver across the UK, USA and Europe, but venue loading docks have their own rules and cut-offs. Shipping to the agency or the client office first is safer unless the venue has confirmed it will hold goods.

Much later than the artwork. The minimum of 50 is per design and sizes are mixed freely inside it, so the split can be confirmed well after the design is locked for production.

Want to order your custom clothes now?

Tell us what you want made and we’ll reply within hours with pricing. Minimum 50 pieces per design, made in 10 to 15 working days from artwork approval, shipped worldwide.

Free and no obligation. Want to see the quality first? A sample is £150 for one or two pieces including worldwide shipping, credited against your bulk invoice.

Keep reading